Sorry, you need to enable JavaScript to visit this website.

Biogas upgrading via membrane process: Modelling of pilot plant scale and the end uses for the grid injection

TitoloBiogas upgrading via membrane process: Modelling of pilot plant scale and the end uses for the grid injection
Tipo di pubblicazioneArticolo su Rivista peer-reviewed
Anno di Pubblicazione2013
AutoriMolino, Antonio, Migliori M., Ding Y., Bikson B., Giordano G., and Braccio G.
RivistaFuel
Volume107
Paginazione585-592
ISSN00162361
Parole chiaveAnaerobic digestion, Biogas, Biogas upgrading, Biomethane, Carbon dioxide, Computer simulation, Decentralised, Hollow fiber membranes, Industrial separation, Industry, Membrane process, Membrane purification, methane, Pilot plant scale, Pilot plants, Polymeric membranes
Abstract

The paper show the techno economical indications for the upgrading process started from biogas with the scope to produce biomethane for the grid injection and delivered to households and industry or alternatively, it can be used as a fuel for CNG-vehicles. The present work give the numerical simulation with a commercial polymeric membrane, PEEK-SEP™ hollow fiber membranes of the PoroGen Corporation, a US based company that specializes in industrial separation process. The membrane, for the numerical simulation, was fueled with methane, carbon dioxide, hydrogen and nitrogen with a composition similar to the real biogas derived from anaerobic digestion of the organic waste. This study will show the feasibility of integrating anaerobic digestion plant with on site polymeric membrane purification system for conditioned biomethane production. © 2012 Elsevier Ltd. All rights reserved.

Note

cited By 25

URLhttps://www.scopus.com/inward/record.uri?eid=2-s2.0-84878347151&doi=10.1016%2fj.fuel.2012.10.058&partnerID=40&md5=df0a6f0289190e0e497eed2dff389b37
DOI10.1016/j.fuel.2012.10.058
Citation KeyMolino2013585